Aluminium Alloy Building Templates Stop End Tie Form Work Systems

Products

Aluminium Alloy Building Templates Stop End Tie Form Work Systems

Aluminium Alloy Building Templates Stop End Tie Form Work Systems

Overview Product DescriptionThe plastic concrete formwork produced by Sufeng uses polypropylene as basic material, addin

Send your inquiry

DESCRIPTION

Overview
Basic Info.
Model NO. aluminium alloy building templates
Advantage No Need Oil
Reusable Time More Than 50 Times
Thickness 12-20mm
Color Black/White and Black/White
Transport Package Pallet
Specification 2440*1220mm/1830*915mm
Trademark Beizhu
Origin China
HS Code 3925900000
Production Capacity 1000 PCS/Day
Product Description
Product DescriptionThe plastic concrete formwork produced by Sufeng uses polypropylene as basic material, adding chemicaladditives toughening, flame resistance, weather resistance and anti-aging, smelt and form new constructionmaterial through chemical molecular structure reorganization.

Hollow plastic formwork is according to the principle of structural mechanics, neatly arranged, increasedfour times support, stronger and more robust;On both sides of the formwork are right angle processing,increasing the bear capacity, construction is more convenient.

Hollow formwork principle also makes the product expansion coefficient small.

STANDARD SIZEQuantity in 20ft ContainerQuantity in 40hq ContainerWeight
2440*1220*12MM560 PCS1260 PCS21 KGS/PC
2440*1220*15MM450 PCS1120 PCS24 KGS/PC
2440*1220*18MM400 PCS900 PCS28 KGS/PC
2440*1220*20MM350 PCS850 PCS30 KGS/PC
Cutting and customized size are available.1. Light weight, high strength, high hardness, impact resistance, wear resistance.2. Surface is smooth, bright and clean; Concreting and forming effect is good for Beizhu concrete formwork.3. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water,no bubbles, sheet size stability, especially suitable for underground and damp environment.4. Good toughness. Beizhu concrete formwork could be used as cambered special-shaped formwork.5. Acid and alkali resistance, corrosion resistance; Beizhu concrete formwork is very suitable for theengineering application in coastal areas, mine, as well as seawall. Beizhu concrete formwork needs not doany preservative treatment both in using and storing the formwork, which do not pollute the concrete surface.6. The reusable time for Beizhu concrete formwork can reach more than 60 times, long service life.7. Waste products can be recycled and reprocessed, making full use of waste materials. This property cangreatly reduce the project cost compared with wooden formwork and bamboo formwork.8. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas.9. Demould easily. No need brushing release agent, only tapping, the Beizhu concrete formwork will fall off.Shorten working hours and speed up the construction schedule efficiently.10. Easy to process. Sawing, drilling and nailing are all available. Beizhu concrete formwork can be combinedvertically and horizontally optionally.11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate,advantageous to the organization construction, effectively improving the construction schedule.Product Advantages1. Waterproof. Won't deform and warp, can be used in damp enviroment; 2. Good strength and toughness. Won't break edges and corners when mould removal, won't fracture;3. Durable. Can be reused more than 50 times, 1 set formwork can finish whole high buiding 2×30 floors,save 50% total budget than plywood and metal formwork; 4. Need no releasing agent. Because of incompatibility of plastics and cement; 5. Light weight. Easier to carry and release worker from heavy labor. Manual operation, no crane required;6. Surface need no maintenance. High pressure water jet can be used to flush the surface;7. High workability. User-friendly, can be nailed, drilled, cut, etc. Compatible with other materials such asplywood, steel, aluminum, etc.Installation Instructions

Remark:

1) Please use tungsten steel saw blade with over 80 meshes when you cutting the plastic formwork.

2) Please avoid the peak temperature in one day when matching the mold. Then the effect after releasingmould is better.

3) Please place the PP formwork as flat as plywood formwork prevent the deformation after releasing the mould.

4) Please have your building workers skill trained when you use PP formwork first time. This is an essential part.General Operation And Notes Of Instrument For Beizhu concrete formwork :1. Method of use as well as wooden formwork, Beizhu concrete formwork reinforcement direction with battendirection placed in cross shaped.2. No need to smear the mold release agent before using Beizhu concrete formwork.3. When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing betweenthe wall plate and keels hould be 10 ~ 20 cm. BEIZHU Beizhu concrete formwork don't need releasing agent.4. The seam-line between Beizhuconcrete formwork should be taped.5. The length of nail should not be too long, generally about 30 ~ 35 mm.6. The strength to drive nailsshould be moderate.7. When removing the Beizhu concrete formwork, please start from the small part of one end, the support andthe plates should be removed at the same time aiming at preventing the template widespread drops, don't letthe corner drop on the ground vertically.8. The Sufeng concrete formwork accesses to be mixed used with wood veneer, bamboo veneer and othermaterial plate.

Company Profile

Shanxi SUFENG New Material Technology Co.,Ltd produced plastic concrete formwork since 2008 andexported since 2005. We have past the certificate of ISO9001:2008 International Quality System in 2015;The plastic concrete formwork has been accepted and applied in construction in China, India, Australia,Singapore, UAE, Finland, Mexico and other countries. We have got the positive feedback from ourcustomers. This new construction material will be popular and used widely all over the world.

FAQ

Q: Are you a factory or trading company?
A: Factory
Q: How can I get the sample?
A:We provide sample free of charge 3-7 work days
Q: What payment terms do you do?
A: 30% T/T as down payment, the balance paid by T/T before shipmentor 100% irrevocable L/C At sight
Q: What is your MOQ for Beizhu concrete formwork?
A: We have some stock for normal size, so it depends on your requirement
Q: How long is your delivery time?
A: 10-15 work days
Q: How to pack the product?
A: On pallet and carton or as customers' requirement
Q: How many quantity can load for one 20/40 container?
A: For 18mm thickness, 400PC/20GP container, 900PC/40HQ container.